200+ estates, a single framework, no sites on hold.
Hyde Housing, London & South East · Over 200 estates, 125,000 flats. Operated by UKCPM, powered by Agena Group.
A portfolio of such a scale that scale and attention to detail can quickly become obstacles.
The Hyde Group is one of the largest housing associations in southern England – with a portfolio of around 125,000 homes spread across more than 200 estates between London and the South East. The requirement was clear: a consistent framework for park management across the entire portfolio – without overlooking the individual character of each estate.
Background
A portfolio of this size presents a complex set of challenges:
- Inconsistent permit regulations, which have developed over time and are often undocumented.
- Special circumstances, such as sheltered housing, which require a fundamentally different approach to communication.
- A mix of resident, visitor and shared-use parking within the same areas.
- Current operational workload of the housing teams.
The dilemma: standardising too early means losing sight of the details. Rolling out too slowly means losing momentum and leaving individual estates stranded in a transitional phase. Hyde needed a partner who could manage both at the same time.
Our approach
Before a single camera was even up and running, the UKCPM team visited all 101 estates in person. Each visit included a meeting with the relevant Neighbourhood Manager. We mapped all the estates into geographical clusters and assigned a dedicated Project and Account Manager to each cluster, who, together with the Hyde team, is responsible for the end-to-end roll-out.
- Desktop surveys and random on-site visits prior to each cluster rollout.
- Rolled out region by region, not across the whole country at once.
- Soft-start phases at every go-live to give residents time to adjust.
- Weekly communication with the Hyde team.
As part of the contract: four paid volunteer days per year for our team to work on local projects, plus a social value fund. The partnership does not end with the enforcement process.
Result:
A controlled roll-out across a geographically dispersed, operationally diverse portfolio – on time, in phases, and without a hitch, covering 125,000 flats.
- Taking the pressure off housing teams – refocusing on residents rather than estate management.
- Fewer complaints thanks to better organisation and fair, transparent rules.
- Continuous improvement through regular reviews and open communication.
- Fully compliant with ISO 9001, 14001 and 27001.
- Social value beyond the contract: four days of volunteering a year, plus a fund.
Residential property / Social housing
Branche
ANPR
Solutions
≈ 2018
In the portfolio since
Your site has more potential
than your current system reveals.
Let’s spend 15 minutes discussing which revenue drivers are effective for your premises – and what a change would mean in practical terms.